Zinc Smelting Project
DATE:16 Nov 2017 瀏覽次數(shù):1
+ . -

Ø The Chifeng NFC Kumba Hongye Zinc Smelting Project includes four phases with total production capacity of 230,000 t/a zinc ingot, 2,400 t/a electrolytic copper and 350,000 t/a sulfuric acid. The project production capacity takes a lead in the industry in China and the equipment is also advanced in the same scale project in China. At the same time, the project also creates a precedent in China of recovering copper from purification residue to obtain cathode copper, as well as a new profit growth point for zinc smelting enterprises. In addition, the process recovers silver from leached residue with floatation to obtain silver concentrate and recovers zinc through extraction from solution after flotation treatment, which also increased recovery of valuable metals. ENFI undertook all of the design and adopted the patent intellectual property technology of hot acid leaching -jarosite process, which is jointly owned by ENFI and Chifeng NFC Kumba Hongye Zinc Corporation. The technology is innovative in China and internationally advanced. After over 20 years, the practical production proved that the technology is sophisticated and reliable, featuring stable production, low operating costs, high rate of first class products and good economic returns. The technical and economic indicators of production management of the enterprise are among the international and domestic advanced level. The Phase IV works won the first prize of 2013 Outstanding Engineering Design Award (provincial and ministerial level), and the new technology for copper recovery from electrolyte purification residue of zinc hydrometallurgical process won a second prize in 2012 China Nonferrous Metals Industry Science and Technology Award.  

    

Ø The Zinc Smelting Project of Inner Mongolia Xing'an Copper & Zinc Smelting Co., Ltd., was designed by two phases. The capacity of Phase I as an EPC project is 100,000 t/a  with adoption of jarosite process. It was put into production in July 2009. 100,000 t/a zinc smelting capacity is added to Phase II project. EPC project includes waste heat boiler, electrics and instrumentation and acid-making tail gas treatment. The process is hot acid leaching - iron removal by spraying and focuses on the treatment of leached residue. The production capacity after completion of all works can reach 250,000 t/a. The Phase II project is under construction. 

Ø The Zinc Smelting Project of Bayannaoer Zijin Nonferrous Metal Co., Ltd. consists of two phases with the design capacity of 200,000 t/a in total and actual output of 220,000 t/a. ENFI undertook design of the project. Phase I has a capacity of 100,000 t/a with adoption of hot acid leaching - jarosite process, which was put into production in May 2006; Phase II has a capacity of 100,000 t/a with adoption of the same process as that in Phase I, which was put into production in September 2009.

Ø Comprehensive Zinc Resource Utilization Project of Baiyin Nonferrous Metals Company Northwest Lead & Zinc Smelting Plant (EPCm), is ENFI's first single-series 150,000 t/a electrolytic zinc project with independent intellectual property. Roasting - hot acid leaching - jarosite zinc hydrometallurgy process is used for the zinc system. The fluidized-bed roaster with an area of 152 m2 is the largest zinc smelting roaster in the world to date. The project, as a zinc smelting demonstration project with special funds support from the Ministry of Industry and Information Technology of the People's Republic of China, ranks the highest standard both in terms of technical level and energy conservation and emission reduction, taking a lead in zinc smelting and also representing outstanding contribution of ENFI to zinc smelting industry. The project is under construction currently.

Ø For the Zinc Smelting Project by Atmospheric  Oxygen-enriched Direct Leaching with Zinc Leaching Residue Techniques of Zhuzhou Smelter Group (EPC), has a design capacity of 130,000 t/a. The oxygen-enriched direct leaching - goethite process is adopted. This process removes the acid-making system and can treat zinc-containing waste residues, and improves zinc recovery by addition of enriched oxygen. This process is among the international latest zinc hydrometallurgy technologies. The project has a purification process of arsenic salt solution with design capacity of 320,000 tons. It is the arsenic salt solution purification system with the maximum capacity of single series applied in zinc smelting system in China. The project was put into full operation in September 2009.

        

Ø The Huize Electrolytic Zinc and Residue Comprehensive Utilization Project of Yunnan Chihong Zinc and Germanium Company Limited reaches the total capacity of 150,000 t/a electrolytic zinc product. The international advanced equipment like large electrolytic tanks, 3.2 m2 cathode sheet, and large automatic cranes are applied in the project. It is a zinc electrolysis plant with the maximum capacity in China. Residues yielded by various systems of the project are recycled and brings the advantages of establishing joint venture for lead and zinc smelting into full play, which builds another new and green lead and zinc smelting enterprise for Yunnan Chihong Zinc and Germanium Company Limited.

    

日本一区二区三区爆乳| 夜夜躁狠狠躁2021| 免费无码在线播放av| 成在线人免费视频| 亚洲区精品区日韩区综合区| 性色欲情网站| 人妻天天爽夜夜爽一区二区| av无码动漫一区二区三区精品| av网站的免费观看| 丰满少妇被猛男猛烈进入久久| 无码成人一区二区三区| 国产成人av在线免播放观看| 内射夜晚在线观看| aaa少妇高潮大片免费看| 一区二区三区四区在线 | 网站| 国产人妻久久精品一区二区三区 | 熟睡人妻被讨厌的公侵犯深田咏美 | 无码国产精成人午夜视频一区二区| 亚洲精品av无码喷奶水网站 | 国产精品女同一区二区在线| 国产av激情久久无码天堂| 国产精品毛片无码| 少妇人妻偷人激情视频| 美女内射毛片在线看3d| 无码福利一区二区三区| 国产精品99久久99久久久| 中文字幕日产无码| 国产成人拍拍拍高潮尖叫| 无码专区 丝袜美腿 制服师生| 久久综合狠狠综合久久| 国产美女久久精品香蕉| 婷婷久久综合九色综合| 国产av大陆精品一区二区三区| 2021亚洲爆乳无码专区| 久久超碰97中文字幕| 午夜不卡av免费| 国产成人美女视频网站| 女人被狂躁到高潮视频免费网站| 六月丁香亚洲综合在线视频| 一本一本久久a久久精品综合麻豆| 曰本女人牲交全视频免费播放|